Swat Motorway Work Inauguration Today By KPK CM Pervaiz Khattak

Swat/Malakand Motorway Work Inauguration Today By KPK CM Pervaiz Khattak

Peshawar (Thursday, August 25, 2016) – Today Government of Kyber Pakhtunkhwa (KP) is starting its first ever Motorway project of the history. Chief Minister of KP Mr. Pervaiz Khattak will inaugurate work on this mega road network project. Foundation Stone Laying or Earth Breaking Ceremonies will be held at Chakdara and Kernal Sher Khan Motorway Interchange.

Why Imran Khan Not to Inaugurate?

In Khyber Pakhtukhwa PTI is ruling party. Tehreek e Insaf’s Charmin is Imran Khan. He has inaugurated many small development projects in past. But Today he will attend the  inauguration ceremony at the occasion or not.

Swat or Malakand Motorway/Expressway will be 81 Kilometers long. Swat Motorway will be 80 meters or 265 feet wide. It will start from Kernal Shair Khan Interchange (Islamabad-Peshawar M1 Motorway).

Total Cost = 41 Billions Rupees

Total Period for Completion = 18 Months (1.5 Years)

Number of Lanes = 4 Lane (two on each side) It will be extended into 6 lane in future.

Route Map of Swat Motorway

Swat Motorway Inauguration Work Ceremony Today In Chakdara Malakand to M1 Kernal Sher Khan Interchange
Swat Motorway Inauguration Work Ceremony Today In Chakdara Malakand to M1 Kernal Sher Khan Interchange

 

History of Swat Motorway Started from Malakand Expressway in 2009 in PPP Government When Federal Minister Lal Muhammad Khan Laid Foundation Stone on June 30, 2016. It was estimated Rs.16 billion cost. It was planned to start from Rakshai Motorway Interchange and travel through Plai, Sakhakot Zilm Kot Tunnel and Chkadra (End Point).

History of Swat Motorway Started from Malakand Expressway in 2009 in PPP Government
History of Swat Motorway Started from Malakand Expressway in 2009 in PPP Government